Home MenuMadison Avenue Corridor Improvement Project
Project Limits
Project Schedule
Project Contact
- Shelley Aschenbrenner, Project Manager, Michelle.Aschenbrenner@cityofloveland.org, (970) 962-2558
Project Information
- Madison Avenue open house presentation [PDF]
- Madison Avenue project flyer [PDF]
- Preliminary design plan for Madison Avenue [PDF]
- Preliminary design for roundabout at Madison Avenue and 37th Street [PDF]
Background
Madison Avenue is a critical corridor central to the City’s overall transportation system identified for design & improvements in the 2035 Transportation Master Plan.
The recent completion of E. 37th Street and a bridge across Dry Creek links Madison Avenue and Taft Avenue with access to US Highway 287. Existing conditions range from a standard, 4-lane section to a narrow 2-lane rural section lacking bike lanes and sidewalks.
Project Updates
-
Utility relocation works is starting.
-
Roadway construction will be bid spring/summer 2024 pending completion of right-of-way and easement negotiations.
-
Roadway construction is currently on schedule to begin in fall/winter 2024.
-
The project will begin at 37th Street, with work progressing south, to Silver Leaf Drive.
-
A new roundabout will be constructed at the intersection of 37th Street and Madison Avenue. This will improve safety and aid in traffic flow.
-
29th Street and Madison Avenue will remain as is, a signalized intersection controlled by a traffic light.
Goals
-
The redesign of this section of the Madison Avenue corridor, is to offer improved safety and transportation options for people, whether they are driving, walking, or biking.
-
Engineers will focus on all modes of travel, making improvements to travel lanes, bike lanes, and sidewalks along the corridor.
-
This project will also look at safety and design improvements at intersections in the area.
Community Benefits
-
Increased safety for all roadway users – improved traffic flow and designation of a safe north-south route for bicyclists and pedestrians.
-
Improved connectivity to US Highway 287 and beyond to Taft Avenue.
-
Effective use of City funds – project team is working to combine and coordinate roadway and utility improvements.